Skip to content

Annex E — References ​

Document FW-REF-0001 · Version 1.0.0 · Status Active · Updated 2026-10-02 · Licence CC BY 4.0 Official English translation of the Turkish source text; in case of conflict the Turkish text prevails.

The standards and regulations Tamga ARF (Architecture and Reference Framework)The document set that describes roles, architecture, trust model and rules. Tamga ARF follows the structure of the EU ARF. rests on, the Tamga decision records and specifications, and the source of every binding rule in the annexes.

1. Standards and regulations ​

ReferenceAddress
Regulation (EU) 2024/1183 (eIDAS 2.0)https://eur-lex.europa.eu/eli/reg/2024/1183/oj
EUDI Wallet Architecture and Reference Framework (ARF)https://eu-digital-identity-wallet.github.io/eudi-doc-architecture-and-reference-framework/
OpenID for Verifiable Credential Issuance 1.0https://openid.net/specs/openid-4-verifiable-credential-issuance-1_0.html
OpenID for Verifiable Presentations 1.0https://openid.net/specs/openid-4-verifiable-presentations-1_0.html
OpenID4VC High Assurance Interoperability Profile (HAIP) 1.0https://openid.net/specs/openid4vc-high-assurance-interoperability-profile-1_0.html
IETF SD-JWT-based Verifiable Credentials (SD-JWT VC)https://datatracker.ietf.org/doc/draft-ietf-oauth-sd-jwt-vc/
IETF Token Status Listhttps://datatracker.ietf.org/doc/draft-ietf-oauth-status-list/
ISO/IEC 18013-5 — mobile driving licence (mdoc)https://www.iso.org/standard/69084.html
W3C Digital Credentials APIhttps://www.w3.org/TR/digital-credentials/
ETSI TS 119 612 — Trusted Lists; ETSI TS 119 602 — Lists of trusted entitieshttps://www.etsi.org/standards
ETSI TS 119 471, 119 472-1/-2/-3, 119 475, 119 461; ETSI EN 319 401https://www.etsi.org/standards
RFC 2119 — requirement keywords; RFC 5280 — X.509https://www.rfc-editor.org/
Longfellow ZKhttps://github.com/longfellow-zk/longfellow-zk
Europass / European Learning Modelhttps://europa.eu/europass/

2. Tamga decision records and specifications ​

Technical detail and the reasoning behind decisions are in the developer documentation (docs.tamga.network). The rules in this framework are compiled from the documents below.

AreaDocuments
Trust model and governanceADR-0009 · ADR-0010 · ADR-0035 · ADR-0037 · SPEC-TRUST-0001 · SPEC-ID-0002 · PM-GOV-0001 · PM-ASSUR-0001
RegistrationADR-0024 · ADR-0026 · ADR-0034
Credential formats and typesSPEC-CRED-0002 · SPEC-CRED-0003 · ADR-0013 · SPEC-SCHEMA-0001 · SPEC-SCHEMA-0002
IssuanceSPEC-PROTO-0001 · ADR-0016 · ADR-0020 · ADR-0021 · ADR-0023
Presentation and verificationSPEC-PROTO-0002 · SPEC-API-0001 · ADR-0012 · ADR-0017 · ADR-0032
WalletSPEC-WALLET-0001 · ADR-0025 · ADR-0027 · ADR-0031
IdentitySPEC-ID-0003 · ADR-0011 · ADR-0022 · ADR-0033
NamesADR-0030

3. Rule sources ​

Every binding rule in the annexes derives from a decision or a coded invariant. The tables below link each rule to its source (DOCUMENT/CODE). A "project management decision" is a written decision of the network's provisional operator. If a rule text and its source conflict, the source prevails.

Annex A — Trust Framework ​

RuleSource
G-Aproject management decision
G-BPM-GOV-0001/G6, G8

Annex B — Tamga Rulebook ​

RuleSource
RB-GEN-01SPEC-BC-0001/DP1, PM-TRUST-0001
RB-GEN-02ADR-0015/TS1, ARCH-0003/CMP1
RB-GEN-03ARCH-0003/CMP4
RB-GEN-04ARCH-0003/CMP2, ARCH-0005/P6
RB-GEN-05PM-GOV-0001/G2
RB-GEN-06SPEC-API-0001/AP3, AP4; ARCH-0004/O4
RB-GEN-07ARCH-0005/P1–P3
RB-GEN-08PM-ASSUR-0001
RB-GEN-09FW-TF-0001 §4.6, §5.2
RB-GEN-10ADR-0009 K3, K6; PM-GOV-0001/G7
RB-OP-01ADR-0009 K5
RB-OP-02ETSI TS 119 612 §5.3.12
RB-OP-03ADR-0009 K2
RB-OP-04ADR-0009 K2
RB-OP-05ETSI TS 119 612 Annex A.2
RB-OP-06ADR-0009 K2
RB-OP-07ADR-0009 K2
RB-OP-08PM-GOV-0001/G1
RB-OP-09PM-GOV-0001/G3, ADR-0017
RB-OP-10PM-GOV-0001/G6
RB-OP-11PM-GOV-0001/G4
RB-OP-12PM-GOV-0001/G8
RB-OP-13PM-GOV-0001/G5
RB-OP-14ADR-0009 K5
RB-OP-15ADR-0009 K4, K7
RB-OP-16SPEC-SCHEMA-0001/D1, D8
RB-OP-17ADR-0017 HV1–HV5
RB-OP-18ADR-0016 HA1–HA3
RB-REG-01project management decision
RB-REG-02SPEC-BC-0001/N1
RB-REG-03SPEC-BC-0001/CA3
RB-REG-04SPEC-BC-0001/I1, I3
RB-REG-05ADR-0010 K5
RB-REG-06SPEC-ID-0002/XC2, SPEC-BC-0001/CA1
RB-REG-07SPEC-BC-0001/GV1, I4
RB-REG-08SPEC-API-0001/AP6
RB-REG-09FW-TF-0001 §5.2
RB-AP-01SPEC-ID-0002/XC1, SPEC-CRED-0002/C15
RB-AP-02PM-GOV-0001/G1, ARCH-0004/O3
RB-AP-03ARCH-0003/K1, SPEC-CRED-0003/S11
RB-AP-04SPEC-PROTO-0001/PR5, SPEC-CRED-0002/C1
RB-AP-05SPEC-PROTO-0001/PR2
RB-AP-06SPEC-PROTO-0001/PR1
RB-AP-07SPEC-PROTO-0001/PR3
RB-AP-08SPEC-PROTO-0001/PR4, PR9
RB-AP-09SPEC-PROTO-0001/PR6, PR10
RB-AP-10ETSI TS 119 471 REQ-EAASP-4.2.1.2; ADR-0025
RB-AP-11SPEC-PROTO-0001/PR7, SPEC-ID-0003, ETSI TS 119 472-3 GEN-REQ-4.1
RB-AP-12ETSI TS 119 471 REQ-EAASP-4.2.1.1
RB-AP-13SPEC-SCHEMA-0002/E11, ARCH-0003/CMP5
RB-AP-14ADR-0010 K5, SPEC-PROTO-0001/PR7
RB-AP-15project management decision
RB-AP-16SPEC-PROTO-0001/PR8, SPEC-API-0001/AP10
RB-AP-17SPEC-CRED-0003/S5, S6
RB-AP-18SPEC-CRED-0003/S2, S3, S7–S10
RB-AP-19SPEC-CRED-0003/S1, S4
RB-AP-20SPEC-BC-0001/R2, I4
RB-AP-21project management decision
RB-AP-22ARCH-0004/O6
RB-AP-23SPEC-ID-0003 §5
RB-AP-24SPEC-ID-0003, SPEC-PROTO-0001/PR7
RB-AP-25ADR-0016
RB-AP-ID-01SPEC-ID-0003/IDP3
RB-AP-ID-02SPEC-ID-0003/IDP11, KVKK m.10
RB-AP-ID-03SPEC-ID-0003/IDP9
RB-AP-ID-04SPEC-ID-0003 §9, IDP10
RB-AP-ID-05ADR-0011 K6
RB-AP-ID-06SPEC-TRUST-0001/TL8
RB-AP-ID-07ADR-0031 PS2, PS3
RB-AS-01FW-TF-0001 §5.1
RB-AS-02SPEC-SCHEMA-0002/E11
RB-AS-03SPEC-SCHEMA-0002/E1, SPEC-SCHEMA-0003/SK6
RB-AS-04project management decision
RB-WP-01SPEC-WALLET-0001/WL1, WL3
RB-WP-02SPEC-CRED-0001 §4, ADR-0025
RB-WP-03SPEC-WALLET-0001/WL11
RB-WP-04SPEC-WALLET-0001/WL8, SPEC-PROTO-0002
RB-WP-05SPEC-WALLET-0001/WL5, WL6
RB-WP-06SPEC-WALLET-0001/WL4, ADR-0027, SPEC-PROTO-0002/PV8
RB-WP-07SPEC-WALLET-0001/WL2, WL10
RB-WP-08SPEC-WALLET-0001/WL7, WL9, ARCH-0003/CMP8
RB-WP-09SPEC-PROTO-0002/PV1–PV4
RB-WP-10project management decision
RB-WP-11FW-TF-0001 §4.6
RB-WP-12SPEC-CRED-0003/S14
RB-WP-13ADR-0017 HV6; SPEC-WALLET-0001/WL5
RB-RP-01SPEC-API-0001/AP6, SPEC-PROTO-0002
RB-RP-02SPEC-PROTO-0002/PV1, PV3, PV6, PV9, PV10
RB-RP-03SPEC-API-0001/AP8, AP11
RB-RP-04SPEC-API-0001/AP12, SPEC-CRED-0002/C15
RB-RP-05SPEC-API-0001/AP2, ARCH-0005/P5
RB-RP-06SPEC-CRED-0003/S12, S13
RB-RP-07PM-GOV-0001/G3
RB-RP-08SPEC-API-0001/AP3, AP4, AP5, AP9
RB-RP-09FW-TF-0001 §5.3
RB-RP-10SPEC-PROTO-0002/PV5, SPEC-CRED-0003/S14
RB-RP-11project management decision
RB-RP-12ADR-0017 HV1, HV4
RB-RP-13ADR-0031 PS4, PS5; SPEC-API-0001
RB-RP-ID-01SPEC-PROTO-0001/PR14
RB-H-01project management decision
RB-H-02SPEC-WALLET-0001/WL8
RB-H-03SPEC-WALLET-0001/WL4, ADR-0027
RB-H-04SPEC-WALLET-0001/WL1–WL2
RB-H-05RB-AP-15
RB-H-06SPEC-ID-0002/XC4, SPEC-WALLET-0001/WL5
RB-H-07project management decision
RB-SCH-01ADR-0010
RB-SCH-02SPEC-SCHEMA-0001/D1, D2
RB-SCH-03SPEC-SCHEMA-0001/D6, D7, SPEC-SCHEMA-0002/E6
RB-SCH-04SPEC-SCHEMA-0002/E10, SPEC-SCHEMA-0003/SK6
RB-SCH-05SPEC-SCHEMA-0003/SK1
RB-SCH-06SPEC-BC-0001/SC3, PM-GOV-0001/G4
RB-SCH-07SPEC-SCHEMA-0001/D4, D5
RB-ENF-01ARCH-0005/P7
RB-ENF-02FW-TF-0001 §4.5
RB-ENF-03project management decision
RB-ENF-04project management decision
RB-ENF-05FW-RB-0001 §0

Status ​

Active — version 1.0.0 (2 October 2026).

Tamga ARF 1.0 · CC BY 4.0 · The Turkish text is the source; this is its official translation